Replace Greenhouse Electric Panelboards and Lighting - Guterman Lab - Tower Road SUCF #161044
Project Description
1. Replace outdated Federal Pacific and Westinghouse panelboards in Greenhouses 1045G, 1060A, 1060F, 1068B, 1134A, and 1135A. All panels are to be replaced-in-kind at the existing location.
2. Contractor to install new Arc Flash labels on all panels shown on the Drawings.
3. Replace the HID lighting with LED lighting in Greenhouse 1068B wings 154, 155, and 156. Work includes removal of existing Greenhouse lighting control wiring in each wing and installation of new Argus Lighting Controls consistent with recent upgrades in the building.
Pre-Bid Meeting Link: https://cornell.zoom.us/j/98838585977?pwd=V21nbUZWNVlKb054bmZTaTJyZ3d6QT09&from=addon
Estimated Construction Budget
$950,000-$1,000,000
Pre-Bid Meeting
Deadline for RFI
Bid Opening
Project Schedule
Architect/Engineer
LaBella Associates, D.P.C.
Facilitiescontracts@cornell.edu
Invited Bidders
Cost Per Set
Project Documents
To obtain documents, visit the Planroom.