Lake Source Cooling Emergency Generator

Project Description

1.    The Cornell University Lake Source Cooling (LSC) Emergency Generator Project includes the installation of one (1) new outdoor enclosed 1 MW, 480V Natural Gas Emergency Generator (EGG) installed on a new outdoor concrete pad, and the installation of two (2) Emergency Generator Control Panels (EGCPs) which will be located in the existing LSC Electrical Room.
2.    The majority of the work in this project will be electrical in nature along with some civil work associated with the generator set concrete pad and underground conduit runs.
3.    Contractor will assist the EGG & EGCP vendors, contracted by the Owner, during equipment testing and commissioning and work with the Owner’s CxA and the free-issued equipment Vendors, to carry out a full functional testing of the entire installation.

Estimated Construction Budget

$560,000 - $580,000

Pre-Bid Meeting

133 Humphreys Service Building/Zoom

Deadline for RFI

Bid Opening

e-Biding Module

Project Schedule

Start: Within five (5) days of written authorization to proceed
Completion: November 30, 2026

Architect/Engineer

CHA Consulting, Inc. 

facilitiescontracts@cornell.edu

Invited Bidders

Name Phone Fax
John Mills Electric, Inc. 607-734-4111 607-734-4150
Matco Electric Corporation 607-729-4921 607-729-0932
Northline Utilities, LLC 518-647-8198 NA
O'Connell Electric Company, Inc. 585-924-2176 585-924-4973
Ferguson Electric, Inc. (716) 853-3321 (716) 852-4887

Project Documents

To obtain documents, visit the Planroom.