Water Filter Plant Electrical Service Upgrades

Project Description

1.    This project will extend the 13.2kV power grid underground to Cornell’s Water Filter Plant (WFP) on Caldwell Road.
2.    A directional bore will be required from an existing loop switch located at the West end of Schurman Hall to an open area near the WFP.
3.    A new pad mount transformer will need to be connected to this 13.2kV circuit extension and then new 480V secondary conduits and cables will be routed to the second floor electric room.
4.    The existing secondary switchgear in the Water Filter Plant will remain in place and be reused.
5.    The Plantations Horticultural Center (PHC) Building, which is also connected to the existing 2400V grid, will be served via a new 480V circuit sourced from the existing WFP secondary switchgear.
6.    The existing overhead 2400V wires that serve both the WFP and PHC, which are mounted on NYSEG poles, will need to be disconnected and removed.

Estimated Construction Budget

$530,000-$540,000

Pre-Bid Meeting

133 Humphreys Service Building/Zoom

Deadline for RFI

Bid Opening

eBuilder Bidding Module

Project Schedule

Start: Within ninety (90) days of written authorization to proceed.
Completion: August 31, 2026

Architect/Engineer

Cornell University Facilities Engineering

Invited Bidders

Name Phone Fax
John Mills Electric, Inc. 607-734-4111 607-734-4150
Matco Electric Corporation 607-729-4921 607-729-0932
O'Connell Electric Company, Inc. 585-924-2176 585-924-4973
Schuler-Haas Electric Corp 585-325-1060 585-325-2364