Renovate Livestock Pavilion for Surge Space Phase 1 SUCF #161062
Project Description
1. Provide selective removal of existing below-grade site utilities including mechanical steam piping, domestic water piping, sanitary sewer piping and communications conduit.
2. Utility work includes installation or extension of new and existing systems to the building and capping of lines within the building in preparation for future renovation work.
3. The project includes the extension of emergency power from Riley-Robb Hall.
4. Backfilling of all trenches and patching of paved surfaces.
5. Provide abatement of hazardous materials, selective demolition of existing tiered seating, restrooms, partial concrete-slab-on grade, and complete removal.
6. Contractors are expected to coordinate Work with separate utility work being performed by the Owner within the immediate vicinity of this project.
Estimated Construction Budget
$980,000-$1,000,000
Pre-Bid Meeting
Deadline for RFI
Bid Opening
Project Schedule
Architect/Engineer
Architectural Resources, D.P.C.
Facilitiescontracts@cornell.edu
Invited Bidders
Cost Per Set
Project Documents
To obtain documents, visit the Planroom.