FY 2021 Billing Rates
FY 2021 Billing Rates
Engineering & Project Management – FY 2021 Billing Rates
Engineering Rates
Skill |
$ |
---|---|
Director of Engineering |
162 |
Eng./Arch. Manager |
151 |
Engineer Architect II |
128 |
Engineer Architect I |
108 |
PC1 |
55 |
PC2 |
71 |
PC3 |
94 |
Facilities Designer II |
86 |
Facilities Designer I |
72 |
Administrator II |
70 |
Drafter III |
63 |
Administrative Asst III |
59 |
Manager 1 |
94 |
Student |
27 |
Capital Projects Support Services – FY 2021 Billing Rates
Transportation
Please see the following web page for complete details: https://fcs.cornell.edu/content/transportatio-infrastructure-charge-policy
All new construction, addition, and renovation projects on the Cornell Ithaca Main Campus with a total project budget of $2,000,000 and higher will be assessed a charge of 1.5% of total project costs. This 1.5% infrastructure charge (hereafter referred to as the Transportation Assessment) ensures that construction projects will finance their fair share of needed transportation infrastructure improvements across the Ithaca Main Campus and other transportation-related initiatives for the benefit of the entire Cornell community.
Project Cost |
PM Fee |
---|---|
< $500K |
7.50% |
$500K - $2M |
4.50% |
$2M - $5M |
3.50% |
>$5M |
3.00% |
Feasibility Studies |
10% |
Note: fee is based on total project minus PM fee listed on PAR, Trans Assess, Project Support if no PAR assessment.
Facilities Management – FY 2021 Billing Rates
Building Care
Custodial Type |
$ |
---|---|
Endowed Custodian |
35.88 |
State Custodian |
26.98 |
President's House |
49.37 |
Tables & Chairs |
35.88 |
Grounds
Skill Level |
$ |
---|---|
Semi-Skilled |
58.57 |
Skilled (Operator) |
72.82 |
Trades / Zones
EE Type |
Craft |
$ |
---|---|---|
EN |
ACR |
77.09 |
EN |
Carpenter |
79.78 |
EN |
Controls |
82.83 |
EN |
Electric |
87.32 |
EN |
Locksmith |
79.78 |
EN |
Maintenance Mechanic |
65.05 |
EN |
Maintenance Mechanic (Shift) |
66.27 |
EN |
Mason |
85.02 |
EN |
Painter |
77.24 |
EN |
Pipe Insulator |
68.65 |
EN |
Plumber |
88.71 |
EN |
Sheet Metal |
84.13 |
EN |
Trade/Maintenance Assistant |
68.65 |
EN |
Shift Differential |
1.22 |
CC |
STCOL ACR |
77.42 |
CC |
STCOL Carpenter |
72.66 |
CC |
STCOL Controls |
78.90 |
CC |
STCOL Electric |
75.83 |
CC |
STCOL Maintenance Mechanic |
59.48 |
CC |
STCOL Maintenance Mechanic (Shift) |
60.38 |
CC |
STCOL Mason |
68.38 |
CC |
STCOL Painter |
69.94 |
CC |
STCOL Plumber |
75.31 |
CC |
STCOL Sheet Metal |
73.53 |
CC |
STCOL TA / MA |
55.98 |
CC |
Shift Differential |
0.90 |
Utilities Enterprise – FY 2021 Billing Rates
Utility Enterprise Rates
Type |
|
---|---|
Electricity (KWH) |
$0.0786 |
Steam (MLB) |
$22.20 |
Chilled Water (THR) |
$0.1920 |
Potable Water (MCF) |
$88.40 |
Wastewater (MCF) |
$87.00 |
Hydroelectric (KWH) |
$0.0823 |
Transportation Fleet / Fleet Services – FY 2021 Billing Rates
Daily & Monthly Rentals
Vehicle Type |
Rental Rates |
||
---|---|---|---|
Daily |
Month to Month |
Per Mile |
|
Compact (Toyota Corolla) |
$49 |
$777 |
$0.16 |
Compact Hybrid (Toyota Prius/Honda Insight) |
$55 |
$880 |
$0.12 |
Midsize (Toyota Camry/Chevy Impala) |
$51 |
$814 |
$0.20 |
Midsize Hybrid (Toyota Camry Hybrid) |
$55 |
$880 |
$0.12 |
7-person mini van |
$55 |
$880 |
$0.23 |
12-person van (& Cargo) |
$55 |
$880 |
$0.31 |
2WD Pickup |
$55 |
$880 |
$0.27 |
4WD Pickup |
$55 |
$880 |
$0.27 |
Annual Rentals
Vehicle Type |
Rental Rates |
---|---|
Economy |
$4,950 |
Budget |
$5,190 |
Average |
$5,609 |
Moderate |
$6,027 |
High |
$6,506 |
Premium |
$7,045 |
Maximum |
$8,421 |