West Campus Generator Coverage Expansion and 13.2Kv Upgrade
Project Description
1. The intent of this project is to re-feed the gothic buildings at West Campus from the 13.2-kv electrical distribution system and remove the portion of the 2.4-kv electrical distribution system serving west campus.
2. The work also includes removing the diesel generators at Baker Tower and Lyon Hall and refeeding these buildings from the emergency generator at Carl Becker House.
3. The scope includes a new underground concrete encased ductbank, new concrete manholes and composite handholes, generator feeder and start circuit from Carl Becker House to Baker Tower and Lyon Hall, a new oil-filled medium-voltage transformer to serve Baker Tower and Boldt Hall, new single-phase dry-type transformers to serve Lyon Hall.
4. The replacement of all of the automatic transfer switches located at Baker Tower, Baker North, Baker South, Boldt Hall, Boldt Tower, Lyon Hall, and Founders Hall with 4-pole switches.
Estimated Construction Budget
$1,010,000-$1,015,000
Pre-Bid Meeting
Deadline for RFI
Bid Opening
Project Schedule
Architect/Engineer
Cornell Facilities Engineering
Invited Bidders
Name | Phone | Fax |
---|---|---|
F.E. Jones Construction of NY, LLC | (607) 348-0045 | (607) 348-0050 |
Andrew R. Mancini Associates, Inc | 607-754-7070 | 607-786-0410 |
LeChase Construction Services, LLC | 315-423-0015 | 315-423-0054 |
Streeter Associates, Inc. | 607-734-4151 | 607-732-2952 |
W. L. Kline, Inc. | 607-724-6637 | 607-724-6650 |
Welliver McGuire, Inc. | 607-535-5400 | 607-535-9254 |
Project Documents
To obtain documents, visit the Planroom.