Anna Comstock House Flooring Abatement and Replacement
Project Description
- Work shall proceed in two phases over two summers
- Phase 1 shall occur in the West Wing during the Summer of 2024.
- Phase 2 shall occur in the East Wing during the Summer of 2025.
- Properly remove and dispose of the existing carpet, associated non-ACM mastic and non-ACM vinyl cove base in the area indicated on the construction plans.
- Remove all mastic from the asbestos-containing brown poured floor topping and leave in a condition suitable to accept new finishes.
- There is asbestos-containing brown poured flooring material below the carpet in the majority of the rooms/spaces.
- The abatement contractor shall take precautions to not disturb the asbestos-containing flooring during carpet mastic removal.
- Coordinate mastic removal methods with flooring contractor prior to abatement to ensure it will not compromise the new flooring application.
- Perform work in a negative pressure enclosure.
- Any loose or dislodged asbestos-containing flooring that is discovered during the carpet removal shall be immediately HEPA vacuumed.
- If the asbestos-containing material is found to be in a damaged condition after carpet removal, the abatement contractor shall apply leveling compound to stabilize the asbestos-containing flooring after successful clearance air sampling.
- Coordinate floor leveling compound application with the flooring contractor during construction.
- Leave the ACM flooring in a condition suitable for installation of new flooring systems by non-certified personnel.
Estimated Construction Budget
$180,000-$190,000
Pre-Bid Meeting
102C Humphreys Service Building
Deadline for RFI
Bid Opening
eB Bidding Module
Project Schedule
Start: Within seven (7) days of written authorization to proceed
Completion: August 11, 2024
Architect/Engineer
Watts Architecture & Engineering
facilitiesengineering@cornell.edu
Invited Bidders
Name | Phone | Fax |
---|---|---|
A.A.C. Contracting, Inc. | 585-527-8000 | 585-783-1464 |
JAG Environmental, LLC | 315-458-1810 | 315-452-0830 |
Abscope Environmental, Inc. | 315-697-8437 | 315-697-9391 |
Bronze Contracting, LLC | 315-896-5084 | NA |
LCP Group, Inc. | 607-592-2866 | 607-348-1465 |
NorthStar Demolition & Remediation dba LVI Environmental Services, Inc. | 585-458-3570 | 585-458-6092 |
Sunstream Corporation | 607-724-4400 | 607-724-0386 |
Project Documents
To obtain documents, visit the Planroom.