Delta Kappa Epsilon 13 South Avenue Electrical System Upgrade

Project Description

1.    In coordination with NYSEG, upgrade the existing 200A single phase electric service from Pole 139 to a new 600A frame and 500A main circuit breaker with 240/120V single phase service. 
a.    Phase 1: exterior work from pole 139 to the facility
b.    Phase 2: interior work with planned shutdown
c.    Phase 3 (Alternate #1): replace basement and second floor subpanels, conduit, and wiring
2.    Provide temporary power and associated wiring to continuously power the following life safety systems while the building is without power:
a.    Fire alarm panel
b.    Dry sprinkler system compressor
c.    Sprinkler system water pumps
3.    Work will include, but is not limited to, excavation, site restoration (plantings, grass, driveway, sidewalk), masonry, and electrical.

Estimated Construction Budget

$220,000-$230,000

Pre-Bid Meeting

102C Humphreys Service Building/Zoom

Deadline for RFI

Bid Opening

eBuilder Bidding Module

Project Schedule

Start: Within thirty (30) days of written authorization to proceed.
Completion: August 1, 2025

Architect/Engineer

Cornell University Facilities Engineering

Invited Bidders

Name Phone Fax
Billitier Electric, Inc. 585-224-1111 585-224-1110
Blanding Electric, Inc. 607-729-3545 607-729-0700
John Mills Electric, Inc. 607-734-4111 607-734-4150
Matco Electric Corporation 607-729-4921 607-729-0932
Patricia Electric, Inc 315-455-7410 315-455-7522
Schuler-Haas Electric Corporation 585-325-1060 585-325-3101

Project Documents

To obtain documents, visit the Planroom.